Curry College, Alumni Recreation Center, Milton, MA New student union building, student assembly and café.
Egan Activity Center, Camp Sayre, Milton MA New natatorium to house an Olympic sized pool used for competitive swimming. Included state of the art sand filtration systems, automatic chemical treatment and remote monitoring of water chemistry and pool temperature. HVAC systems included 100% air exhaust with heat reclaim for energy efficiency.
Emerson College, Fitness Center, Little Building, 80 Boylston Street, Boston, MA Project manager and electrical engineer for the preparation of design build documents. The design build documents converted a basement storage space to a new health and fitness center.
Emmanuel College, Boston, MA Electrical engineer for the preparation of the due diligence report for the electrical and life safety systems for the dormitories, library, administrative, dining, gymnasium, chapel, auditorium, and classroom buildings at the Fenway Campus. Report included recommendations to upgrade the existing electrical and life safety systems for each building.
Fay School, Harlowe Gymnasium and Harris Multi-Arts Center, Southborough, MA EA provided the mechanical and electrical design for this multi-purpose events center that included a gymnasium and auditorium.
Harvard University Racquet Facility, Boston, MA New construction of an indoor racquet facility for tennis, squash, racquetball, and handball. Facility included locker rooms and athletic department offices.
Harvard University Faculty Club, Cambridge, MA Total renovation of the 36,000 SF facility. Facility included three (3) kitchens, dining rooms, function rooms, guestrooms, bar, and laundry facilities.
Harvard University, Cambridge, MA MEP and Structural design for renovations to the Bright Hockey Arena along with a new supporting multi-purpose facility. Systems renovations were implemented to eliminate ongoing fogging problems.
Harvard University, Cambridge, MA Evaluate existing MEP and Structural conditions to the Gordon track facility.
Shady Hill School, Cambridge MA MEP/FP design for the new sustainable design athletic center with the goal of a LEED silver rating.
Tufts University, Medford, MA MEP design for a new University boathouse.
Woodland Golf Club, Woodland, MA Mechanical master planning study; ongoing kitchen renovations.
INDIVIDUAL EXPERIENCE:
Framingham High School, Framingham, MA Phased renovation of existing 450,000 SF+ school included new addition with Media Center. Renovations included complete replacement of HVAC systems / equipment, including phased replacement of existing Boiler plant and addition of a second, new Boiler plant. Project included locker room, showers, gymnasium, and weight room.
The Lawrenceville School, Lawrenceville, NJ HVAC design for new Library building for prestigious private preparatory school; building was fully air conditioned, using air-handling units mounted in the building's Attic and false dormers for outside air intakes. Project included Locker room, showers, gymnasium, and weight room.
Athol Middle School, Athol, MA HVAC design for a new 83,000 SF Middle School. Project included Locker room, showers, gymnasium, and weight room.
Hingham High School, Hingham, MA HVAC design for phased renovation / addition to the 230,000 SF High School; design included complete replacement of HVAC equipment and almost all systems. Project included Locker room, showers, gymnasium, and weight room.
The Country Club, Brookline, MA Addition of air conditioning to Clubhouse kitchen; renovation and addition to Locker Buildings; renovation of Tennis Building.
Rumson County Club, Rumson, NJ Clubhouse renovation.
YMCA, Boston, MA Women's fitness center. Complete renovation and conversion of original Boston YMCA facility ground floor space to women's fitness center.
Fay School Field House, Southborough, MA New recreation field house with locker facilities, classrooms and auditorium.
Wellesley College, Wellesley, MA HVAC design for sports center.
Emmanuel College, Boston, MA Prepared due diligence report for the electrical and auxiliary system for the dormitory, library, administrative, dining, gymnasium and classroom buildings at the Fenway.
Norton Elementary School, Norton, MA New 120,000 SF elementary school included kitchen facilities, gymnasium and showers.
Lincoln School, Brookline, MA Design of new elementary school including kitchen facilities, gymnasium and showers.
Norrback School, Worcester, MA Design of new 120,000 SF elementary school including kitchen facilities, gymnasium and showers.
Westover Job Corps Fitness Center One-story athletic facility with full gymnasium.
New Schools or major additions. (Including gymnasiums) Marlborough MA, Leominster MA, Methuen MA, Pittsfield MA, Fall River, MA.(2).
Town of Westminster Massachusetts, Westminster, MA Design of 120,000 SF School including classrooms, gymnasium, administration and auditorium.
New England Patriots Stadium, Foxboro, MA Design of site electric and telephone power distribution systems as well as site lighting for over 4.5 million square foot Site. Design included coordination and negotiations with local utilities for obtaining a dual 10 megawatt redundant service to a new 68,000 seat NFL football stadium as well as the associated facility support buildings including indoor practice facility and waste water treatment plant.
Hopkington High School., Hopkington MA This facility included a large field house with a track and multiple gyms with the ability to section them off.
The College of St. Rose, Albany, NY Gymnasium expansion and renovation that included all new Lighting Electrical, HVAC, Fire Protection and plumbing in the gym, locker rooms and fitness center. A new entry lobby and service access was also added to the facility.
|