Individual and Firm Experience:
3Com, Marlborough, MA Site utilities master plan design including water, sewer, storm and fire protection for an anticipated 8 new office buildings on the Marlborough campus.
Allied Domecq Headquarters, Randolph, MA Technical participation in real estate evaluation study for 125,000 SF office master plan renovation and addition. Included retail area for Dunkin Donuts, Baskin Robbins and Togos. Also studies for Dunkin Donuts University and Heublins Liquor product laboratory.
Astra Pharmaceuticals, MA Master plan for 600,000 SF/10 year development program and subsequent project management assignments for implementation.
Bayer Corporation, Hopedale, NJ Developed master plan for all site utilities on the Hopedale campus.
Boston College, Brookline, MA Developed site utilities master plan for all buildings on the Law School campus.
Children's Hospital at Sterling Medical Center Waltham, MA Developed campus wide utilities master plan used by Children's for the repositioning of this 400,000 SF healthcare facility.
Deaconess Hospital, Boston, MA Campus site utilities master plan design including water, sanitary, storm and fire protection for 7 buildings.
Dept. of the Navy, Nautilus Park Groton, CT Design of the complete renovation and all new services to a 400 duplex housing unit site.
Gillette Stadium, Foxboro, MA Design of site electric and telephone power distribution systems as well as site lighting for over 4.5 million square foot site. Design included coordination and negotiations with local utilities for obtaining a dual 10 megawatt redundant service to a new 68,000 seat NFL football stadium as well as the associated facility support buildings including indoor practice facility and waste water treatment plant.
Harvard University, Cambridge, MA Helped develop a master plan that evaluated and recommended means to expand the central plant distribution to other areas of the campus
Hoechst Marion Roussell, Bridgewater, NJ The Phase One plan evaluated and made recommendations for the expansion of the existing central plant and site utilities including steam, chilled water, domestic water, sewer and fire protection system. Phase Two designed and implemented the expansion of the central plant and distribution systems to supply new buildings and increase the utility feeds to old buildings.
Holy Cross College, Worcester, MA Master planning systems review for all campus buildings.
JPI Housing, Cranston, RI Engineering services for a 300-unit 4 building apartment complex with Club House and Pool.
Logan International Airport, Boston, MA Developed a master plan that evaluated how the existing central plant and site distribution should be upgraded in light of the Logan Expansion Program. This Plan was integrated with construction that included new terminals, roads and utility distribution. The energy usage of the heating system was reduced by using a hot water system for distribution to new buildings and planning the conversion over time of the existing buildings.
Middlesex County Hospital, Waltham, MA Complete upgrade and renovation of entire electrical site distribution wiring of four hospital buildings.
Oak Grove Village, Malden/Melrose, MA Engineering services for a 550-unit housing complex with parking facilities.
Raytheon Corp., Tewksbury, MA Design of 640,000 SF office and research and development laboratory facility consisting of 4 buildings in total.
Schering Plough Lafayette, Union, NJ Provided central plant expertise as part of a team evaluating expanding this pharmaceutical research site.
Smith College, North Hampton, MA Developed a master plan that looked at a variety of ways the system could be upgraded to meet the campus cooling needs for the next twenty years. The existing cooling system and site loads were evaluated to determine the existing equipment condition and the present cooling loads. At the end of the Study Phase, the Plan was used as the basis to expand the central plant from 1300 tons to 3300 tons.
Tufts University, Medford, MA Developed master plan to upgrade campus utilities in anticipation of new student housing and performance center.
University of Baghdad, Iraq Campus site utilities master plan including gas, water, storm, sanitary and fire protection for 549 buildings.
University of Massachusetts, Dartmouth, MA Developed utilities master plan design for 1,200 units of new student housing and student center.
WPI, Worcester, MA Master planning systems review for all campus buildings.
Yale, New Haven, CT Master planning systems review for all buildings on the medical school campus.
|